GridIQ AnalysisTuesday · 20/10

From Power Plant to Pay Point: Where the Chain Breaks

Nigeria does not lose its electricity in one place. It leaks at every stage, and the leaks compound.

Dense tangle of overhead power lines above corrugated rooftops in a crowded urban neighbourhood
The last mile: overhead lines in a dense settlement, where energy is delivered but not always measured, billed or paid for.

You load a token on Monday. By Thursday it is finished, and the light was off for half the time you needed it. You are left asking the question every Nigerian has asked at some point: where does all this money go, and why is there still no steady light?

The honest answer is that every unit of electricity makes a long journey: from a gas well or a river, through a turbine, across a transmission line, down a feeder, into a meter and, finally, back as money. Follow that journey with the latest NERC numbers and you find something uncomfortable. The chain does not break in one place. It narrows at almost every link.

13,625 MWinstalled capacity
4,458 MWavailable in Q1 2026
₦64collected for every ₦100 of energy received

The journey, stage by stage

Latest NERC figures, by stage

StageWhat happensLatest figure
InstalledPlants built13,625 MW
AvailablePlants able to run4,458 MW (Q1 2026); 5,038 MW (September 2026)
GeneratedPower sent to the grid4,113 MWh/h (Q1 2026)
TransmittedCarried to DisCosabout 8% lost on the way (7.96% in Q1 2026)
ReceivedTaken in by DisCos6,982.32 GWh (Q2 2026)
BilledMeasured and invoiced5,812.31 GWh, 83.24% of energy received
CollectedPaid by customers₦603.64bn of ₦744.67bn billed (81.06%)
RemittedSent upstream₦385.44bn of ₦410.38bn invoiced (93.92%)

These figures come from different periods, so read the table as a map and not as a single calculation.

Break point 1

The plants

The first and largest drop happens before a single unit reaches the grid. About two-thirds of installed capacity was unavailable in Q1 2026, because of gas shortages, maintenance backlogs and plant faults.

Installed vs available capacity, Q1 2026

Available4,458 of 13,625 MW

Roughly one megawatt in three could run.

Break point 2

The money behind the gas

Plants need fuel, and fuel needs payment. Debts owed to generators and gas suppliers have led some suppliers to cut off supply to indebted plants. This is the point where the money problem becomes a physical power problem.

Break point 3

The grid

Transmission lost about 8% of what the plants sent out in Q1 2026, and the grid operated with very little headroom, at a 92.26% load factor. Two collapses in January 2026 showed how thin that margin is.

Break point 4

The last mile

Of the energy DisCos received in Q2 2026, about 17% (roughly 1,170 GWh) was never billed. Of the ₦946.57 billion worth of energy received, ₦201.9 billion was not billed and a further ₦141.03 billion was billed but not paid. That leaves the DisCos with ₦603.64 billion, or about ₦64 for every ₦100. Poor metering, estimated billing, losses and theft all sit here.

Where ₦100 of energy received ends up, Q2 2026

Collected · ₦603.64bn Billed, unpaid · ₦141.03bn Not billed · ₦201.9bn

Total energy received was worth ₦946.57bn.

Break point 5

The way back

Of the ₦603.64 billion collected, about 64% (₦385.44 billion) went upstream to NBET and the Market Operator, in GridIQ's calculation. The remainder has to run the DisCos' own operations.

GenCos, for their part, say they receive only about 35% of what they invoice each month, and that new debts keep building. The Federal Government's verification reduced claims of more than ₦4 trillion to about ₦3.3 trillion in agreed liabilities. Two bonds, ₦501 billion in January 2026 and ₦728.979 billion with settlement beginning on 9 October 2026, are now paying part of it.

One loop, not five problems

The five break points are linked. Weak collections at the meter mean less money for the generators. Less money for the generators means less gas and fewer working plants. Fewer working plants mean worse supply, and worse supply gives customers a reason not to pay.

MeterWeak collections
GeneratorsLess money
PlantsLess gas, fewer running
SupplyWorse light
CustomersLess reason to pay

Fixing any single link will help, but only fixing the loop will last.

Sources and notes

GridIQ Analytics & Insightsgridiq.africa